Showing results 111 to 120 of 1485 for “safety”
tce-visible-identification-policy-en.pdf
The proposed Leming Lake Sales Lateral Loop (Field Lake Section) Project will increase natural gas transportation service on our existing NGTL natural gas pipeline system in Alberta to meet growing demand.
Hydrostatic testing fact sheet
We can confirm there was an incident at the construction site on the Northwest Mainline (NWML) Loop No. 2 Bear Canyon North Extension section of the North Corridor Expansion Project, near Fairview, Alta. on Aug. 26, 2022. A worker was performing planned construction activities on site and suffered a non-life-threatening injury. Our emergency procedures were activated and work on-site was immediately suspended. Emergency crews transported the worker by ambulance to the nearest hospital.
tce-personal-protective-equipment-en.pdf
TC-InvestorDay-2023-Agenda.pdf