Results 1091 to 1100 of 1576 for “projects 2026”

Located entirely within the Municipal District of Bonnyville, this pipeline is south of the City of Cold Lake, Alberta, and is connected to the NGTL System. The existing Cold Lake Border Sales metering facility was replaced with a new metering facility to accommodate the additional gas volumes.

The fact sheet describes key points about continually improving the integrity and reliability of TransCanada’s pipelines and it's assets. This is TransCanada’s highest priorities.

The Keystone XL project team has been conducting snake monitoring research in southern Alberta at multiple sites near the pathway of the pipeline. In Alberta, prairie rattlesnakes and other snake species are designated as species of special concern.

This document is a comprehensive report on a company's activities throughout the preceding year.