Showing results 101 to 110 of 1442 for “safety”
The proposed McLeod South Project is 48-inch diameter pipeline that would be located entirely within Yellowhead County, Alberta.
tce-investorday-agenda-2022.pdf
We can confirm there was an incident at the construction site on the Northwest Mainline (NWML) Loop No. 2 Bear Canyon North Extension section of the North Corridor Expansion Project, near Fairview, Alta. on Aug. 26, 2022. A worker was performing planned construction activities on site and suffered a non-life-threatening injury. Our emergency procedures were activated and work on-site was immediately suspended. Emergency crews transported the worker by ambulance to the nearest hospital.
Media Advisory — TC Energy Corporation today announced that its Keystone pipeline has returned to service following the approval of its repair and restart plan by the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA).
RE: TC Energy Response to draft report GAO-21-588, “Information on Keystone Accidents and DOT Oversight”
tc-living-and-working-near-pipelines-ca.pdf
tce-esg-investor-pack.pdf