Results 1041 to 1050 of 3186 for “tuscarora pipeline”
tce-FERC-6.90.0-TransCanada-Keystone-Rate-Schedule.pdf
TC Energy Lobbying Information Sheet
TransCanada Corporation a lancé aujourd’hui, aux parties intéressées, un appel de soumissions exécutoires portant sur des contrats de services de transport du pétrole brut sur le système de pipeline Marketlink, entre Cushing, en Oklahoma, et les marchés sur la côte américaine du golfe du Mexique.
This document provides a comprehensive report on a company's activities throughout the preceding year.
"We do in-line inspections periodically and it gives us an overall health of the pipeline,” John Sadler, Manager of In-line Inspection Canada at TC Energy.
The horizontal directional drilling (HDD) the Northern Courier Project completed under the Athabasca River in Alberta, Canada, turned out to be the longest 42-inch-wide HDD completed in North America to date at 2,195 metres (7,200 feet), in order to install the pipeline 70 metres below the riverbed.
Sixty years ago, TransCanada recruited a "highly-trained crew of experts from around the world" to operate Station 41 and ensure its reliability. Today, that crew is made up of local, expertly trained technicians, who share the same values and dedication to the safe and reliable operation of TransCanada's namesake pipeline.