The map depicts all of TransCanada's liquid pipelines throughout North America.
The Towerbirch pipeline project will include 55 km of 36-inch pipeline paralleling the existing NGTL Groundbirch Mainline, along with new meter stations, and expansion of one meter station. The majority of this projects scope will be within British Comumbia, with only a portion in Alberta.
Since 2001, Carseland has been providing Alberta with up to 95 megawatts of electricity from its industrial cogeneration plant located in Carseland, Alta., at Agrium’s Carseland Nitrogen Operation. View the location map.
The map depicts the southern section of the ANR Pipeline System.
The Foothills System is a 1,241 km (771 mile) long network of pipelines comprising the Foothills B.C. and Foothills Saskatchewan lines.
The Mazatlan Pipeline Project has 430 km (267 miles)of pipeline in length. It's estimaed to carry 202 million cubic feet per day of natural gas.
With this project, 2.9 miles (4.7 km) will be built along with two compressor stations and replacement of 26 miles (41.8) of existing pipeline. The changes will increase capacity by 1.3 billion cubic feet per day.
The 430 km (267 mile) Mazatlán Pipeline will safely deliver natural gas to CFE’s Mazatlán power plant and other large areas in Sinaloa.